Preliminary design of intake work, submarine line and pumping station to estimate construction costs.
Year | 1997 |
Client | Bufete Industrial Construcciones S.A. de C.V. |
Specialty | Civil |
Scopes | Basic engineering |
Executive Description | The work consisted of the analysis of the existing information about the coastal processes of the site (maritime climate), in order to determine the associated parameters to consider. The best location of the intake work was determined. Considering the geomorphology of the area as well as the prevailing wave regime. The hydraulic pre-design of the submarine pipeline, the civil pre-design of the intake work, the preliminary foundation of both works, were elaborated. I elaborated the dimensioning of the lift station, its hydraulic model and preliminary structural design. Finally, the verification of the conduction capacity of the existing discharge channel was elaborated. |
Conceptualized Works Summary | Intake Site: 10 m3 / s Submarine Line: 700 m |